Free Design Package — Only 20 slots
Book Now
Asian Tiles — Since 1982, Asian Means Quality
ISI Certified ISI Certified
Quality You Can Trust
Limited Offer · First 20 Bookings Only

Your Complete Outdoor Flooring Plans.
Free.

For Government Projects & Contractors, builders, architects and homeowners in Chhattisgarh — get a custom paving plan, 3D visualisation, and step-by-step installation guide. Designed by our team. No cost. No catch.

Total Value ₹5,000 → Yours FREE
Slots filling fast · Offer closes once 20 designs are booked
What's Included

Three deliverables. Worth ₹5,000. Yours at no cost.

As Chhattisgarh's own paver manufacturer since 1982, we don't hand you a rough sketch — we hand you a build-ready package: exact dimensions, material quantities, and a 3D preview of the finished surface, prepared by the same team that casts and lays the pavers.

01 Sample paving plan — top view with dimensions and material legend

Paving Plan

Scaled top-view drawing with exact dimensions, module breakdown, and material quantities by RAL code. Hand it straight to site — no guesswork.

02 3D visualisation — hero render, aerial, axonometric and close-up views

3D Visualisation

Photo-realistic renders of your driveway, courtyard or pathway from every angle — exactly as it will look once laid. Approve the design before you spend.

03 Installation guide — 7-phase construction sequence with bedding cross-section

Installation Guide

The full 7-phase construction sequence — sub-base prep to final compaction — with bedding cross-section. So your installation lasts decades, not years.

43+Years of Quality
50,000+Clients Served
ISICertified
32+Cities & Districts Covered
Book Your Free Design

Fill this in. We'll do the rest.

Takes 2 minutes. Our team gets back within one working day.

Limited slots — Only the first 20 bookings get the full ₹5,000 package free.
Form not loading? Open it in a new tab or WhatsApp us directly.
Claim Free Design WhatsApp